MAJOR ERECTION WORKS
- Engaging Man for the Maintenance MTC I, MTC II& Stacker in SME/ MM/M II at NLC Ltd., Neyveli
- Major overhauling of MTC – V in Mine II at NLC Ltd.,Neyveli
- Mine–II–SME – Spreader 149 – Overhaul and Augmentation work at NLC Ltd., Neyveli
- Mine–II–SME –BWE – 1572 Overhaul Works at NLC Ltd., Neyveli
- Mine–ISME –BWE – 1145 (Mechanical Portion) at NLC Ltd., Neyveli
- Mine–II–AMC – 2006 – 08 – Reconditioning of unit assemblies in SME / RC / MII at NLC Ltd., Neyveli
- Mine–II– BWE – 1420 –Major Overhaul work at NLC Ltd., Neyveli
- Mine–II–AMC – 2006 – 08 –Replacement of unit assemblies in SME/ MRR/MII at NLC Ltd., Neyveli
- Major BD,RC & Inspection works in 1800 / 2000 / 2400mm Conveyors, Tripper car & Transport Crawler in Mine –I at NLC Ltd., Neyveli
- Maintenance work of 20000 TPH SPREADER and MTCE 4420 at NLC Ltd., Neyveli
- Annual maintenance of replacement of unit assemblies and reconditioning of Bucket and cutting bows in SME Zone Mine – I at NLC Ltd., Neyveli
- Major Overhaul of BWE – 1421(Mechanical Portion) in Mine – II at NLC Ltd., Neyveli