services

MAJOR ERECTION WORKS

  • Erection, testing and commissioning of Pr.Parts Items for LEP of unit – II Thermal power station – I at NLC Ltd., Neyveli
  • Erection work in Hopper Portion and Water Wall Panel Modification work in Unit – V TS–II at NLC Ltd., Neyveli
  • Completion of Balance works in Retrofit ESP ducts and its structure of various units at NLC TS–I at NLC Ltd., Neyveli
  • Erection, testing and commissioning of Pr.Parts Items for LEP of unit – V Thermal power station – I at NLC Ltd., Neyveli
  • Erection of 2Nos feed water heaters of Unit – II Thermal Power Station – II at NLC Ltd., Neyveli.
  • Erection of 2Nos feed water heaters of Unit – II Thermal Power Station – II at NLC Ltd., Neyveli
  • Erection of 110 MW Boiler No.5 under M/s.ABB ALSTOM at Ennore Thermal Power Station (ETPS), Ennore.
  • Erection of Mill,ID and FD Fans for 210 MW Boiler in Thermal Power Station – I at NLC Ltd., Neyveli
  • Erection of Coal Mill, ID & FD Fan, ABG and Submergible Slag Conveyor in Boiler I &II and Erection of Air Pre Heater in Boiler –I in Thermal Power Station–I Expansion (2x210 MW) at NLC Ltd., Neyveli
  • Erection of cold flue gas ducting from APH to stack and its supporting structures for 210 MW Boiler in TS–I Expansion at NLC Ltd., Neyveli
  • Erection of critical pipe line works in Boiler 1 for 210 MW Boiler in TS–I Expansion at NLC Ltd., Neyveli
  • Erection of Combustion system, in Boiler 1 for 210 MW Boiler in TS – I Expansion at NLC Ltd., Neyveli
  • Erection of Boiler Main Structure and Galleries Structures for 2 X 250 MW Thermal Power Station – I Expansion Project at NLC Ltd.,Neyveli.
  • Erection Testing & Commissioning of Super Critical Test Facility Boiler (650MW) in BHEL MHD complex Trichy.
  • Erection of Boilers Pr.Parts for Boiler Unit #2 for 2 x 250 MW TS–II Expansionsat NLC Ltd.
  • Fabrication of Boiler(2x500MW) Conveyor structure under L&T at NTPL, Tuticorin
  • Replacement of Re Heater # 2 ( Unit–2 &1) Final Loop assembly in Thermal Power Station –II.at NLC Ltd., Neyveli
  • Replacement of Eco Coil in Thermal Power Station – II at NLC Ltd., Neyveli
  • Erection of Boiler Main Structure and Galleries Structures for 2 X 250 MW Thermal Power Station – II Expansion Project at NLC Ltd.,Neyveli